go to text

GUD block construction results

Private Residence/Ota City, Gunma Prefecture
Construction in March 2019
The GUD block is used for the entrance door and the floor of the shoe cloak of the new house completed in March 2019.
The children who belong to the soccer team were busy practicing the game during the practice, and the construction was done with the aim of keeping the moisture and smell of the sweat-infused shoes from trapping in the entrance and shoe cloak.
Back to TOP